Monday, December 21, 2009

New Year Flooring

Pat Canavan sent me this notice about the Sanctuary flooring:

Our sanctuary will have a different look January 3. The main floor sanctuary carpet, along with the Narthex and Narthex stairwell carpet, will be removed down to the bare floor. The actual flooring project begins on Monday, January 4, and you will see progress being made with each succeeding week. The project should be 4-6 weeks in length. The Amen pews on either side of the pulpit will be removed during that time to provide interior storage space for the floor tiles, which will minimize project costs. Each week, you will see a diminishing supply of boxes as the tiles are aligned, cut, and installed in their proper sections. As always in projects like this, we appreciate your patience during this work and will do our best to minimize the effects as much as possible.

I learned also that the two front pews will also be removed to store the rolls of new carpet. Ahhh...reminds me of the good old days when we installed the air conditioning and filled the sanctuary with scaffolding.

This, by the way, is one of the major Capital Campaign projects. We still need more contributions to the campaign. If you have yet to give or pledge, you can still do so. To learn how to do, click here.

0 Comments:

Post a Comment

<< Home